Description
✔ Package Include: 4 Pcs Single Track, 6 Pcs Double Tracks, 8 Pcs Double-Decking Beam 97-107″, 1 Pc Double-Decking System Sliding Handle, 1 Pc Tool Holder for E-Track and X-Track Systems
✔ 4 pcs Double-Decker Beam Track – Single: Length: 6 ft, Height: 4-1/2″, Sliding Tracks for Easy Operation of the Double Decking Beams
✔ 6 Pcs Double-Decking Beam System – Double Tracks: Length: 6', Height: 8″, Material: High Grade Aluminum
✔ 8 Pcs Double-Decking Beam 97-107″ for 102 Trailers: Decking WLL: 2,200 lbs./1,000 kg , Shoring WLL: 1,500 lbs./680 kg
✔ 1 Pc Double-Decking System Sliding Handle: Easy tool for Operating the Double Decking Beams
Mytee Double Decking Beam System – 8' Partial Trailer Double/Single/Double Track Package
– 4 Pcs Double-Decking Beam System – Single Tracks
- Double Decking Beam System – Single Tracks
- Compatible with Kinedyne Part # 2051-072
- Sliding Tracks for Easy Operation of the Double Decking Beams
- Helps reduce potential damage to freight caused by double-stacking pallets.
- Standard E-Track Fittings Can be used on the tracks
- Length: 6 ft
- Height: 4-1/2″
– 6 Pcs Double-Decking Beam System – Double Tracks
- Double Decking Beam System – Double Tracks
- Compatible with Kinedyne Part #2052-072
- Helps reduce potential damage to freight caused by double-stacking pallets.
- Length: 6'
- Height: 8″
- Material: High Grade Aluminum
– 8 Pcs Double-Decking Beam 97-107″ for 102 Trailers 2200# WLL
- Decking Beam 97-107″ for 102 Trailers 2200# WLL
- High Strength Aluminum for maximum WLL to Weight Ratio
- Decking WLL: 2,200 lbs./1,000 kg
- Shoring WLL: 1,500 lbs./680 kg
- Steel Heads with Zinc coating for smooth operation
- Compatible with Kinedyne Part #'s 9100-102, 9100-102C
– 1 Pc Double-Decking System Sliding Handle
- Double-Decking Beam System Sliding Handle
- Easy tool for Operating the Double Decking Beams

Reviews
There are no reviews yet.